Case Study · Energy / Renewables · UAE
PV combiner box
The Challenge
UAE solar EPC needed IEC-certified combiner boxes for a 50 MW project. Tight delivery window before summer peak.
The Result
300 boxes shipped in 6 weeks. IEC test reports included. Now a repeat customer with annual orders.
What YounglyGroup Delivered
- ✓ Design and assembly to the confirmed drawings and specification
- ✓ Genuine Schneider / Siemens / Phoenix Contact components as specified
- ✓ IEC 61439-1/-2 documentation, CE declaration and per-batch test reports
- ✓ Pre-shipment FAT and inspection report with photographic evidence
- ✓ English technical drawings and wiring documentation
- ✓ Export packing, customs documentation and door-to-door delivery
Similar project? Tell us your requirements.
MOQ from 1 unit for prototypes, 5-day RFQ turnaround, and full export documentation.