Case Study · Industrial Automation · Germany
Custom control cabinet
The Challenge
German panel builder needed a Chinese OEM partner to expand capacity for European industrial customers. 4-week sample-to-production cycle.
The Result
120 cabinets delivered in 8 weeks. Zero QC rejections. Ongoing quarterly orders.
What YounglyGroup Delivered
- ✓ Design and assembly to the confirmed drawings and specification
- ✓ Genuine Schneider / Siemens / Phoenix Contact components as specified
- ✓ IEC 61439-1/-2 documentation, CE declaration and per-batch test reports
- ✓ Pre-shipment FAT and inspection report with photographic evidence
- ✓ English technical drawings and wiring documentation
- ✓ Export packing, customs documentation and door-to-door delivery
Similar project? Tell us your requirements.
MOQ from 1 unit for prototypes, 5-day RFQ turnaround, and full export documentation.